PT Cirebon Electric Power (PT CEP) hereby invites eligible companies to participate in the prequalification for Coal Procurement for Cirebon Coal Fired Power Plant 1x660 MW.

Interested parties must hold one of the following valid licenses:

- Production Operation Mining Business License / Ijin Usaha Pertambangan Operasi Produksi (IUP-OP)

- Coal Contract of Work (CCoW) / Perjanjian Karya Pengusahaan Pertambangan Batubara (PKP2B)

- Special Mining Business License for Production Operation / Ijin Usaha Pertambangan Khusus Operasi Produksi (IUPK-OP)

- Special Production Operation Mining Business License for Transportation and Sales / Ijin Usaha Pertambangan Operasi Produksi Khusus (IUP-OPK) untuk Penangkutan dan Penjualan

- Transportation and Sale License / Ijin Pengangkutan dan Penjualan (IPP)

General Requirements:

Annual coal requirement: maximum estimated at 3.11 million metric tonnes

Term of contract: 5 years with a maximum of 2 (two) x 5-year extensions

Coal Supply Agreement: To be entered and signed in 2025

Coal delivery commencement: 1 January 2027

1. Coal Specification Requirements:

Description

Range

Rejection Limit

Gross Calorific Value kcal/kg (ar)

Min 4.500

< 4,500

Total Moisture % (ar)

22-34

>34

Ash Content % (ar)

Max 4.5

>4.5

Total Sulphur Content % (ar)

Max 0.2

>0.2

Operation Status

- Current Operating Mine

- Minimum Reserve: ≥5 million Tonnes

2. Registration & PQ Document Distribution

Date/Time

28 May-11 June 2025

Place

By electronic mail (email):

coal@cirebonpower.co.id

3. Aanwijzing: 04 June 2025

4. Submission Dateline: 19 June 2025 at 15:00 WIB

Complete requirements for Prequalification will be provided in the Prequalification Document.